News

Prev Next

15-09-2016

DOC receives follow-up vessel management contract for BO1

Following the successful implementation of the vessel management for wind farm operator Ocean Breeze...

read more

30-08-2016

Offshore Wind Farms – Protection and Security

DOC and the Fraunhofer IFAM Institute OWiSS project partners will be presenting at the Future Securi...

read more

21-07-2016

DOC @ "WindEnergy Hamburg 2016"

Along with over 1.200 exhibitors the DOC will be presenting talks and exhibiting at the "WindEnergy ...

read more

13-06-2016

Windforce 2016 - Review

The 12th annual offshore conference WINDFORCE took place from June 7th through 9th, 2016 in Bre...

read more

18-02-2016

DOC is active in the offshore wind project Sandbank

DOC provides know-how from lifting operations up to three-dimensional models ...

read more

28-09-2015

DOC congratulates wpd on Butendiek OWF completion

On September 9th 2015 the offshore wind farm Butendiek located west of the Island of Sylt was o...

read more

17-08-2015

DOC assumes sponsorship for radio play character

As part of the “Die Hinnerks” radio play series DOC has assumed the sponsorship for the “W...

read more

14-08-2015

SAIL 2015 - by night

A nocturnal greeting from the Sail 2015 in Bremerhaven.

read more

13-08-2015

SAIL 2015 - second day

Perfect weather for participants and visitors alike on the second day of the SAIL 2015.

read more

12-08-2015

SAIL 2015 - Sail-in parade and opening

Today the SAIL 2015 in Bremerhaven has been officially opened with a Sail-in parade.

read more

11-08-2015

SAIL 2015 in Bremerhaven - DOC with front row seats

The "SAIL 2015" is about to start and DOC is equipped with front row seats to this five da...

read more

04-03-2015

Kick-off for OWiSS research project with DOC participation

This joint project will take a closer look at the protection and safety of offshore wind farms as cr...

read more

31-10-2014

BARD Offshore 1 – successful project completion

The BARD Offshore 1 project was successfully completed last year and DOC was able to contribute...

read more

04-06-2014

DOC wins during 32nd Peter Gast Regatta

The Deutsche Offshore Consult GmbH sailing on SY BUKH BREMEN wins with the class 6 (ORC-Club C) DOC...

read more

04-06-2014

Windforce 2014 with DOC participation

The Windforce 2014 Trade Fair and Conference will be held from June 17th to 19th in Bremen. You wi...

read more

13-02-2014

DOC invited to ICPC Plenary Meeting in Dubai

This year’s Plenary Meeting of the “International Cable Protection Committee” (ICPC) will be held in...

read more

01-10-2013

Inauguration of „Viewpoint Offshore Wind Energy“

DOC is actively involved in the newly installed offshore viewpoint located in Bremerhaven’s Kaiser P...

read more

14-05-2013

OWF Riffgat - further cable section installed

The Riffgat OWF export cable-lay project was already re-started in March with a speedy installation ...

read more

26-04-2013

BARD Offshore 1 - Winter break over

Inner-array cable lay operations at BARD Offshore 1 OWF were resumed after the winter break. Immedi...

read more

23-04-2013

Offshore wind study programme by forwind and wab – Oliver Spalthoff appointed to advisory council

On April 19th 2013 the advisory council meeting of the offshore wind study programme was held at t.i...

read more

18-02-2013

DOC particpates in Com4Offshore together with OHB Systems AG

DOC is one of five participating companies in the ESA feasibility study "Com4Offshore". The goal is ...

read more

21-12-2012

Projects on winter break

The offshore projects "Riffgat" (export cable lay, project management and construction supervision) ...

read more

23-08-2012

DOC at HUSUM WindEnergy 2012

18.-22.09.2012 / Halle 2 - Stand 2B09WAB Gemeinschaftsstand   EUROPEAN UNIONInvesting in yo...

read more

02-07-2012

Windforce 2012 – A recap

This year’s Windforce 2012 conference premiered in Bremen and also featured a first-time trade fair...

read more

02-07-2012

Riffgat Project – Kick-off

After over one year of preparatory project work the nkt cables Riffgat project team – formed by nkt ...

read more

22-06-2012

DOC involved in ”OFFSHORE WIND STUDIES”

DOC is providing tutors as well as especially prepared lecture notes for a new continuing studies pr...

read more

07-06-2012

AREVA Wind Lift Tools

On behalf of AREVA Wind, DOC has successfully conducted a training program for the future offshore i...

read more

24-05-2012

Windforce 2012

DOC at Windforce 2012 in Bremen - June 26th to 29th 2012 – Hall 5 – Stand A40 The annually organi...

read more

08-03-2012

MARISSA Demonstrator-Workshop

DOC hosts second MARISSA Demonstrator-Workshop On March 29th 2012 DOC will host the second MARISSA ...

read more

23-12-2011

DOC and ATLAS TITAN co-operate

DOC and ATLAS-TITAN sign co-operation agreement On December 22nd 2011, Mr. Franz Vollmer – managi...

read more

05-09-2011

DOC at EWEA Offshore 2011 in Amsterdam

Nov. 29th to Dec. 1st 2011Hall 10 – WAB joint stand     DOC will be exhibiting at this ...

read more

30-05-2011

DOC „shapes“ its first own engineer

For the first time, DOC took on a student for his work-training semester and supported him during th...

read more

12-05-2010

DOC becomes 250th member of the Windenergie-Agentur Bremerhaven/Bremen e.V

During one of their regular round-table meetings on the 12th of May 2010 the “Windenergie-Agentur Br...

read more
The Deutsche Offshore Consult GmbH (DOC) was founded in 2009.With over 40 experts DOC provides independent competence for the realization of Offshore Wind Farm Projects. DOC is able to contribute current project experience for all phases of an Offshore Wind Farm Project. DOCs’ own Engineers, Geoscientists, Logistics-, Commercial- and Offshore Experts address all main and crucial sub works. Over the past years, DOC has been involved one way or another in almost all of the German offshore projects. Our most outstanding areas of competence are subsea power cables (Inner-Array and Export Cable) as well as Marine Operations (Heavy-Lift, port handling, installation of foundations and WTG components). We are able to contribute our longstanding experience to all phases of a project – from the planning phase to Engineering to the operative implementation. Our commitment to provide the best specialists for the realization of your offshore project will ensure that quality, time and planned budget demands are met.
Our experience in the engineering, realization, controlling and supervision of projects and sub-projects reduces the implementation risks.
 
An early involvement of our staff will ensure an optimized project development. Therefore it is important that we are not acting as external consultants only but complement the project team on a long-term basis taking over responsibility for a successful project implementation. Our office locations in Bremen and Bremerhaven were deliberately chosen placing us in the center of the German offshore sector. Further offices in Hamburg, Emden and Rostock are planned.
 
Start
 

 

DOC-Logo-Engineering w   DOC-Logo-Operations w   DOC-Logo-Chartering w   DOC-Logo-Crewing w   DOC-Logo-Capital w   DOC-Logo-Software w   DOC-Logo-Campus w